Details

A medium data center needed peak control without compromising uptime. We combined a 250 kWp rooftop PV array with a 400 kWh battery, and installed sub-meters at PDU/CRAC levels for granular analytics.

Quick Stats

PV
250 kWp → ~410 MWh/y
Battery
400 kWh (4-hr)
Demand reduction
~20–25%
PUE improvement
−0.05–0.07
Uptime
Maintained (no single point of failure)

Details

Customer
Tier-III DC, Amman
Meters
24 sub-meters (PDU/CRAC)
Integration
EMS with ATS/bypass
Inverters
2× 100 kW + 1× 60 kW
Safety
Coordination study & selectivity